Strengthening of the Munich-Verona railway axis Brenner Base Tunnel

Strengthening of the Munich-Verona railway axis Brenner Base Tunnel

Strengthening of the Munich-Verona railway axisBrenner Base Tunnel Client: BTC SCARL Place and date: Mules – Italia. 2017 – ongoing Services: Geotechnical monitoring, rockburst monitoring, advancing geophysical surveys. Prev 1of6 Next The Brenner Base...
Enel Dams

Enel Dams

Enel Dams Client: ENEL – INCO Plance and Date: Italy. 2013 – 2018 Services: Geophysical surface and in hole surveys.   Prev 1of6 Next Akron has carried out activities of geophysical investigations and non-destructive controls on the Enel park in the...
Resia and Glorenza Hydroelectric Power Plant

Resia and Glorenza Hydroelectric Power Plant

Resia and Glorenza Hydroelectric Power Plant Client: HYDROS Place and date: Italy – San valentino alla muta. 2013 Services: Geophysical investigations in hole and geophysical investigations in tunnel Prev 1of4 Next The Glorenza hydroelectric power station is the...
Large Hadron Collider Cern

Large Hadron Collider Cern

Large Hadron Collider Cern Client: CERN Place and date: Geneva – Switzerland. 2017 – 2019 Services: Geophysical surveys and non-destructive checks on the LHC tunnel. Prev 1of4 Next The HL-LHC project (High Luminosity Project – Large-Hadron Collider)...
Section AV/AC – Valico dei Giovi

Section AV/AC – Valico dei Giovi

Section AV/AC – Valico dei Giovi Client: COCIV – TREESSE ENGINEERING Place and date: Italy. 2012 – ongoing Services: Static and dynamic tests on line decks, geophysical investigations and non-destructive tests.   On behalf of the COCIV...